We have a product order that calls for Material Subassembly A. Subassembly A calls for Component Part B. We created the product order and also created linked child order for Subassembly A. MRP has a demand line for Component Part B coming from Subassembly A AND from the product order (MRP must have created this demand item by blowing through the BOM). MRP is not recognizing that Component Part B is already demanded on the child order, so now we’re doubling up demand for Component Part B.
Page 1 / 1
I think I got it figured out. I had grace period set to zero, and so Acumatica was thinking the product order needed its own planned order to supply Component B for Subassembly A for the product order. I set grace period to 30 and it took care of the problem.
Thank you for sharing your solution with the community
Reply
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.