I have a customer who costs EVERYTHING used to manufacture an item (i.e. pallets, bags, box labels, etc.). But a quantity of 1 is used per manufacturing order, not per piece during an operation.

Is there a way to add those items to the BOM without having to have it be a fraction of the item per item produced?

Please help :)

The only option of which I am aware to capture the cost is to setup it up as fixed overhead.


If think you can also try to use 'Batch size' column in Material tab(BOM screen) and set it on 0 for specific material.

 


That’s exactly what I’m looking for, thank you so much!