Skip to main content

I am attempting to create a flow of basic steps for enabling the MRP feature. Please let me know if I am missing anything in particular, or confirm that the basic steps are included below. Thank you!

 

MRP Configuration Prerequisites

  1. Numbering Sequences: CS201010
  2. Production Order Types: AM201100
  3. Work Calendar:  CS209000
  4. Replenishment Classes: IN208800
  5. Warehouses: IN204000
    1. Review Manufacturing and Location Table tabs
  6. Stock Items:  IN202500:
    1. Review Replenishment Info

 

Configuration Steps:

 

  1. Creating an MPS Type: AM203000
  2. General MRP Settings: AM100000
  3. MRP Buckets: AM201200

 

Step required to view data: Regenerate MRP

It would be nice if this actually included all of the details. The help is missing a lot of information. 


Great! Thank you!


There is an Implementation Checklist topic for MRP in the Acumatica on-line help file.  I would recommend you cross check your list with the help.

 


Reply