I am attempting to create a flow of basic steps for enabling the MRP feature. Please let me know if I am missing anything in particular, or confirm that the basic steps are included below. Thank you!
MRP Configuration Prerequisites
- Numbering Sequences: CS201010
- Production Order Types: AM201100
- Work Calendar: CS209000
- Replenishment Classes: IN208800
- Warehouses: IN204000
- Review Manufacturing and Location Table tabs
- Stock Items: IN202500:
- Review Replenishment Info
Configuration Steps:
- Creating an MPS Type: AM203000
- General MRP Settings: AM100000
- MRP Buckets: AM201200
Step required to view data: Regenerate MRP