We recently started scanning production tickets from operation to operation, in doing so we had some users who were incorrectly scanning operations in multiple times.
ie. A production ticket called for 100 on operation 10 and 20 but say they scanned 500 in for operation 10 and 100 for operation 20 which would then complete the production ticket but also cause a variance (We are backflushing labor/overhead and materials and also Standard Cost on items) We’ve been running cycle counts to correct the raw materials but not sure what else we can do to fix this.
We now have a very high balance in our WIP Variance Account which I believe is overstating our cost of goods. I can’t think of a way in the system to correct this since all of these production tickets are closed.
I’m no financial guru so I may be thinking about this incorrectly. But our cost of goods the last 2 months have been extremely high.