Creating PO for Outside Services

  • Apr 4, 2024 6:13 PM UTC
  • 33 replies
  • 1289 views
  • Translate All

Forum|alt.badge.img

We are in the middle of implementation and I am writing a workflow for issuing Purchase Orders to Outside Process vendors for metal finishing (Ie: Powdercoating, Plating, etc),  however I am not certain that I am totally clear on the correct process. 

We have setup non-stock items to represent the outside processes.  These have been defined as a service, They have vendor(s) associated with them on the vendors tab and the default price as been set to $1.00.   

On the manufactured (stock) item I have defined a BOM and on the operation step for the outside service I have added the Non-Stock item (Powdercoat) to the BOM as a material.  The qty required has been set to the per-piece cost that I was quoted,  the Unit cost remains at $1.00, The material type has been set to “Sub Contract” and the Subcontract Source has been set to “Purchase”.  On the Outside processes tab I have also checked the “Outside Process” box and have selected the preferred vendor for this operation.  

I have then opened a production order for this manufactured (Stock) item and use the Create Purchase Orders Action fromt he ,  the system is not recognizing/honoring the vendor that is specfied in the production order menu,  however when the Create PO form opens, the system is not honoring the vendor that was previously defined on “Outsource Tab” of the BOM.      It appears the system is only looking at the “default” vendor defined on the Non-Stock item,  or it is leaving the field blank if the Non-Stock item does not have a vendor designated as default.  

This leaves me a with few questions:

  1. What is the purpose of defining the preferred vendor on the outside process tab of the BOM if the system doesn’t honor it.  
  2. Is my workflow for issuing PO’s for outside processes correct?  Is there a document that fully defines this process?  I have found documents that address parts of this process, but I am not certain that I have found something that covers the process start to finish…

Any help on this matter would be appricated. 

Best answer by Debbie Baldwin

@MattWSM 

  1. No need for Vendor shipment Return - it has no play in this process flow. You just need to do a move transaction. I’m not sure of your process but if materials are not backflushed you may also need to issue some materials at that operation. 
  2. PO receiving is not changed. I only set mine up that way so that I could issue the correct $$ to the production order. Maybe someone else can comment how they get the actual cost to the production order? 
View original

33 replies

Debbie Baldwin
Community Manager
Forum|alt.badge.img+2
  • Acumatica Product Manager
  • Apr 4, 2024 6:43 PM UTC

@MattWSM - I have a couple of quick videos that I could send you. Send me an email. 

Debbie.baldwin@acumatica.com. 

Translate

Forum|alt.badge.img
  • Author
  • Jr Varsity III
  • Apr 4, 2024 7:51 PM UTC

@Debbie Baldwin   Just sent you a email.

Thanks

Translate

Forum|alt.badge.img
  • Author
  • Jr Varsity III
  • Apr 5, 2024 6:19 PM UTC

Debbie,

Thank you for sharing those videos,  that was very helpful.   I do have a few more comments/questions that I want to confirm my understanding:

  1. When the goods are being returned from the vendor it appears that there is no need for a Vendor Shipment Return.  If I understand correctly, the only transaction that is needed to get the goods back into the system is a “Move Transaction” from the Outside Processing Operation to the next Operation on the routing.  Is that correct?  Does creating a Vendor Shipment Return offer anything in this case? 
  2. When the PO is receipt is generated,  the receipt qty needs to be a $ amount, not the qty of goods being received.  This seems like this would be confusing to the receiving clerk as the packing list coming from the vendor would typically only have qty of goods being returned on it,  not $$.  Do you know how companies are handling this out in the wild?

I am trying to simplify the workflow related to outside services as much as possible, and cut down on the number of transactions our shipping/receiving team needs to make.   Any feedback on how others are handling this would be much appricated.  

Translate

Debbie Baldwin
Community Manager
Forum|alt.badge.img+2
  • Acumatica Product Manager
  • Answer
  • Apr 9, 2024 12:37 PM UTC

@MattWSM 

  1. No need for Vendor shipment Return - it has no play in this process flow. You just need to do a move transaction. I’m not sure of your process but if materials are not backflushed you may also need to issue some materials at that operation. 
  2. PO receiving is not changed. I only set mine up that way so that I could issue the correct $$ to the production order. Maybe someone else can comment how they get the actual cost to the production order? 
Translate

  • Freshman I
  • Sep 19, 2024 9:01 AM UTC

@MattWSM - I have a couple of quick videos that I could send you. Send me an email. 

Debbie.baldwin@acumatica.com. 

Hi Debbie. 
I am in the same situation. We do a lot of outsourced but with few RM we must supply. Can you send me the videos as well. tmauk@globalinterconnect.com. Thanks 

Translate

Debbie Baldwin
Community Manager
Forum|alt.badge.img+2
  • Acumatica Product Manager
  • Sep 19, 2024 12:19 PM UTC

@trademark - sent this morning. 

Translate

  • Freshman I
  • Sep 26, 2024 1:43 PM UTC

@MattWSM - I have a couple of quick videos that I could send you. Send me an email. 

Debbie.baldwin@acumatica.com. 

Hey Debbie, would it be possible to send me those videos as well eford@allentowninc.com

Translate

Debbie Baldwin
Community Manager
Forum|alt.badge.img+2
  • Acumatica Product Manager
  • Sep 26, 2024 2:04 PM UTC

@eford  - just sent.

Translate

  • Freshman I
  • Sep 26, 2024 2:59 PM UTC

@Debbie Baldwin Thank you!

Translate

Forum|alt.badge.img
  • Freshman II
  • Oct 10, 2024 3:05 PM UTC

@Debbie Baldwin requesting same videos, I am also dealing with significant amount of outsourced items and would like to simplify process as much as possible for shipping/receiving.  

 

EMail: sah@bixbyintl.com

 

Do you see any future enhancements that would simplify this process?  My current system is much simpler and allows us to issue material to a purchase order directly, no need for creating all the work orders, receipts, etc. 

Translate

rjacobs63
Jr Varsity III
Forum|alt.badge.img
  • Jr Varsity III
  • Oct 10, 2024 8:03 PM UTC

Hi @Debbie Baldwin , can you share the videos with me too?  Email: rena@absbean.com TIA!

Translate

Debbie Baldwin
Community Manager
Forum|alt.badge.img+2
  • Acumatica Product Manager
  • Oct 10, 2024 10:22 PM UTC

@rena98 and @sahbixby - just sent

Translate

Forum|alt.badge.img
  • Freshman II
  • Oct 15, 2024 12:47 PM UTC

@Debbie Baldwin I could not find the email - any chance you can resend?

Email: Sah@bixbyintl.com

Translate

evelkly
Jr Varsity II
  • Jr Varsity II
  • Jan 14, 2025 10:53 AM UTC

Good morning ​@Debbie Baldwin, would you mind sharing the video with me as well?  Email is evelkly@tccholdings.com.

Thank you!

Eric

Translate

rfairchild58
Varsity I
Forum|alt.badge.img+1

​@Debbie Baldwin 

I would like the videos as well.  Coincidently, I too am working on creating the instructions as to how this should be done.

 

-Ron

r.fairchild@texasscenic.com

Translate

​@Debbie Baldwin 

Could you also share those videos as well? Thank you!

lourhen.maceda@infosoft.com.ph

Translate

Forum|alt.badge.img
  • Freshman I
  • Jun 16, 2025 10:03 PM UTC

​@Debbie Baldwin - can you please post the links to the videos on this post? Thanks. 

Translate

dVagradyan04
Freshman I

@MattWSM - I have a couple of quick videos that I could send you. Send me an email. 

Debbie.baldwin@acumatica.com. 

Hi Debbie,

Can I get those videos as well? Thanks in advance.
dvagradyan@aktion.com

Translate

Debbie Baldwin
Community Manager
Forum|alt.badge.img+2
  • Acumatica Product Manager
  • Jul 7, 2025 6:00 PM UTC

​@dVagradyan04 - sent the links via email.

Translate

Forum|alt.badge.img
  • Freshman I
  • Jul 15, 2025 3:50 PM UTC

​@Debbie Baldwin - Can I please get the videos - Thanks 

Email - Mali@solvereco.com

Translate

Debbie Baldwin
Community Manager
Forum|alt.badge.img+2
  • Acumatica Product Manager
  • Jul 15, 2025 4:26 PM UTC

​@mali94  - just emailed links.

Translate

  • Freshman I
  • Aug 1, 2025 1:25 PM UTC

Hi ​@Debbie Baldwin  can I also get the videos. Thank you !

malcom@da.ca

Translate

  • Freshman I
  • Aug 29, 2025 2:14 PM UTC

Debbie, can you send me these videos also, thanks.

Andy  andy@relinc.net

Translate

  • Freshman I
  • Oct 3, 2025 12:09 PM UTC

​@Debbie Baldwin can you also provide me with the video?  Do you ever NOT send the full qty of the vendor shipment at one time?  I’ve noticed some costing issues if we don’t send the exact amount of the Production Order Requirement.  It seems to be costing all material into the product upon 1st move transaction.

Translate

Forum|alt.badge.img+1

​@Debbie Baldwin can you also provide me with the video?  Do you ever NOT send the full qty of the vendor shipment at one time?  I’ve noticed some costing issues if we don’t send the exact amount of the Production Order Requirement.  It seems to be costing all material into the product upon 1st move transaction.

 

We have a customer that does this. The issue is you can only apply a single PO to the production order for outside services.  So they do a PO for the full quantity, but then do multiple vendor shipments.  They will then receive in the partials on the purchase receipt.  