We are a company that creats our own literature type material. We are currently moving towards using projects to track our expenses for the various things we produce. With that, we also make a number non-stock items. Is it possible to add/link machine time to a project? I figured out that I can list a certain machine as an equipment and then submit an equipment time card that’s linked to a project to add the correct expense to the project. But I’m not sure if there is a better way to get the same result. Any ideas?
Thanks for your help