Production Order with Outside Process

  • 8 July 2024
  • 1 reply
  • 41 views

This is the use case.

Stock Item   ABC

BOM    ABC has 1 outside process for welding.

BOM ABC contains

Stock Item 1,
Stock Item 2,
Stock Item 3

Steps

  • Create Production order for ABC
  • Create Purchase Order for ABC
  • Create Vendor Shipment (this shipment should have Stock Item 1,2,&3 being shipped to outside process vendor).  but when i create the vendor shipment from the production order it only has the Stock item ABC on the shipment not the components).   The ABC item is the item i should be receiving back into inventory from the vendor.

I am missing a step or have the steps being done incorrectly.  What should the proper work flow be?

1 reply

Userlevel 5
Badge +1

@sspencer Did you select the Material Type for the stock items as Subcontract and subcontract source as “Ship to Vendor”?

 