Hello,
We have a multi-level BOM that requires
- Outside Processing at the Sub-Assembly level
- The Components require shipment to the Outside Processing Vendor (“Vendor Shipment)
Issue:
- When Running MRP at the top level Finished Good level - MRP Display will suggest the creation of the Sub Assembly Production Order
- But MRP will NOT suggest the Components on the Sub Assembly that are marked for “Vendor Shipment”. (It does suggest if a Component is short and is marked as Regular)
Options that I tested
- If a Production Order is created for the Sub Assembly and MRP is run - it will suggest Prod Order for the Sub-Assembly.
- The problem is 2 fold -
- There are Sub Assemblies that are 3-5 deep and hence will require a lot of effort to create and keep track of all the Prod Orders and Components required.
- Very Heavy and a lot of Multi-Step “Outside Processing” (Components shipped to Vendor 1 → who in turn will ship to a second one → who after processing will send it back to the client)
- Seasonal Business - which requires Heavy Sales Forecasting and Planning of Components which may have a very long lead time - requiring MRP to suggest Component requirement at all levels. (Have not tried - but could a work around be creation of a Flat BOM-with all components at a single level and mark it as Plan BOM ID for Top level FG? - for MRP - The issue here is with frequent Engineering changes possible to the FG - keeping the 2 BOMs in sync could be an issue).
Any insights, inputs would be helpful - Thanks