Dear all,
We have a requirement after MRP calculation which is to allocate by vendor ratio
Example:
MRP Requirement = 100
Vendor A Ratio = 25%
Vendor B Ratio = 35%
Vendor C Ratio = 55%
MRP Allocation:
Material for Vendor A = 25
Material for Vendor B = 35
Material for Vendor C = 55
How can we perform like above example? Is there any function in Acumatica can do like that?
Thank you for your kind attention.
Best Regards,
Agung