is there a way to manufacture in seconds and change the operation sequence after you have made the BOM or routing.
example:
operation 10 takes 1.5 minutes
operation 20 takes 15.25 minutes
etc
I only see days hour minutes or hour minutes but no seconds.
thanks in advance