We include within the BOM an Outside service process where the cost is billed on PO as not stock item. Is there a way to included the cost from non-stock items with the BOM and Production Order.
Does anyone have an import template for multi level BOMs. I have BOMs that have multiple levels and include Outside processing. 2020 R2.
Is there away to update the BOM material items expiration date? We just are testing some BOMs in our pilot configurations. and realized that some items have expired? As far as I can tell you would need to make a new revision? Does the expiration date effect using the BOM in Production.I am new to Manufacturing. I figured you should be able to update the existing. Thank you in advance for your assistance
Already have an account? Login
Enter your username or e-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
Sorry, our virus scanner detected that this file isn't safe to download.