We do have several companies in the textile industry - what specifically are you needing? Most importantly the Production Order needs to be able to accommodate the Garment Size Curve (Sub-Items) where the Bill of Materials (Kit Spec) may differ per Size in terms of Components and Ratings. The Production Order across the Size Curve needs to be seen as one Order, as Raw Materials need to be Calculated and Issued per Production Order and not per Size. The Production Order should be able to Calculate the Raw Materials to be Issued to the respective CMTs taking into consideration the Production Qty and respective Loss Factors per Raw Material. We need visibility of the Garment from the day that the Production Order is placed until it is in Stock. So, throughout the process.
We do have several companies in the textile industry - what specifically are you needing? Hi Angie, thanks for feedback, Im glad to hear there are some clients using the Manufacturing module for Textiles. I will need to request the details from the lead consultant to provide you with but some of the high level items are: They need to be able to put a enter a manufacturing declaration, where by the system would need to generate the required Production orders. Need to track actual Raw material consumption more accurately If you could pop me an email brettd@astraia.co.za we can take this offline. Thanks
Thanks @ChandraM We implemented a client 4 years back before MAtrix items were an option so setup for a garment manufacturing company that needs size, colour and style which we accomplished with sub items. Now we told they being phased out and there is no clear conversion path to matrix items. Client is also wanting to use the manufactyring module which we were advised against by Acumatica using sub-items.
Thanks @StevenRatner but it doesnt seem to cater for sub-items? We implemented a client 4 years back before MAtrix items were an option so setup for a garment manufacturing company that needs size, colour and style which we accomplished with sub items. Now we told they being phased out and there is no clear conversion path to matrix items. Client is also wanting to use the manufactyring module which we were advised against by Acumatica using sub-items.
Any updates on this query as we in a similar situation with a client using sub items but wanting to use the manufacturing module as well. We would need to convert form sub-items to matrix items
Thanks so much, I actually found the below post which has some code that can get this to work, will give it a bash:
Thanks so much Laura, will try it out and get back to you :)
Thanks GabrielAcumatica support got back to me with similar feedback that it sends 10 emails per connection, which meant about 450 connection attemots for the number of statements that were being sent out. I have advised the client to look at an email service and will suggest the Sendgrid option to them
@ray20 Stay tuned for 2021 R1. At the 2021 R1 launch event we are planning a demonstration of a feature that may meet your needs (SO to PO and Shipment to Purchase Receipt). This feature is great for companies wihtin the same tenant, but we need this for a client that wants to do inter tenant processing. They have 3 related companies sitting in seperate tenants that buy and sell between one another and the ability to do the SO and PO population automatically between them would be fantastic. Is this on the cards as a possible new feature release in the near future?
Already have an account? Login
Enter your username or e-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
Sorry, our virus scanner detected that this file isn't safe to download.